Developers
The plumbing package on a new build, and the part most people price badly: what happens in the year after handover.
A development is judged twice. Once at handover, when everything is new and nothing has been used, and again about nine months later, when forty owners have been running showers, dishwashers and washing machines through a system that until then had only ever been tested.
The second judgement is the one that decides what the plumbing actually cost you. It is also the one most packages are priced as though it does not exist.
What we do on a development
The plumbing package, rough-in through to trim-out, under a general contractor or direct depending on how the scheme is set up.
Coordination against handover dates rather than against the floor plan, which on a phased scheme is the difference between an orderly sequence and three trades in one riser.
Commissioning and testing that reflects the building being lived in rather than being signed off. A system that passes a test in an empty block and then behaves differently under real demand is a system that was tested for the wrong thing.
Pre-handover walks, finding the snags before the buyer does.
The warranty year, which we treat as part of the job rather than a cost to be minimized afterwards.
The part people price badly
Here is the pattern we see in Miami, repeatedly.
The package is competitively priced and delivered on schedule. Handover goes well. Then the calls start — and they do not go to the plumber who did the work, because that relationship ended at practical completion. They go to the developer’s office, or to the management company, or to whoever answers the phone.
Somebody gets sent. They did not install it, so the first visit is diagnosis. The second visit is the repair. The third is because the first two did not find the actual cause, which was a decision made at rough-in that nobody on site now knows about.
That is three visits and a frustrated owner for something the original installer would have fixed in one, because they would have recognized it. Multiply by forty units and a year, and the cheap package stops being cheap — except the cost has moved somewhere nobody is measuring, which is your reputation with the first cohort of owners in a building you still have units to sell in.
What we do differently about it
We would rather hold the warranty calls. Not as a favor — it is a genuinely better arrangement for both sides.
The person who installed the system is the fastest person to fix it, and the calls tell us things about our own work that we would otherwise never learn. A connector type that weeps at month eight is information. If those calls go to somebody else, we never hear it, and we install the same thing on your next scheme.
So we would rather agree at appointment how the warranty period is handled, who logs what, and what the route is for an owner with a problem. It takes a conversation at the start and removes a year of improvisation at the end.
Working to a date
Developers do not buy plumbing. They buy a date, and plumbing is one of the things that can take it away from them.
Which means the useful qualities are unglamorous. Turning up on the day we said. Calling ahead when something has changed rather than after. Reading the drawings properly enough to raise the clash at design stage rather than discovering it with a core drill. Leaving a site the next trade can work in, because a riser left as somebody else’s problem is a delay with a two-week fuse.
Nineteen years in the trade, most of it in London, where sites are tighter, access is worse and the inspection regime is unforgiving. That is not a sales line on a development — it is why the habits are the way they are.
The licensing, plainly
BritFix is the customer-facing business: the quote, the schedule, the admin and the maintenance work. Licensed plumbing work is carried out by a licensed Florida contractor, Lic. #CFC1433820, and the work is completed to the Florida Building Code. We are insured, and a certificate naming whoever your contract requires goes over before mobilisation.
We are not engineers and we do not design systems. Where a scheme needs a designer, it needs one, and we will say so rather than stretch to cover it.
Tell us what you need
Send the job through and we will come back to you.
Questions we get asked
Do you work under our GC or direct?
Either. Under a general contractor we are a subcontractor and behave like one — we read the drawings, we hit the inspection stages, and we do not make the GC chase us for a date. Direct, we carry more of the coordination ourselves, which some developers prefer on smaller schemes where there is no GC worth the margin. What we will not do is take a direct appointment and then behave as though somebody else owns the schedule.
What does the warranty year actually look like?
That is the question worth asking before the job starts, and almost nobody does. In the twelve months after handover you will get calls — a running toilet, a connector weeping, a water heater that was commissioned in an empty building and is now serving a family of five. We would rather those calls came to us than to you, because we installed it and we can fix it in one visit. Agreeing who handles them, and how they are logged, is part of the appointment rather than an afterthought.
Can you phase to our handover dates?
Yes, and on a phased development it is usually the whole conversation. Units that hand over in March and units that hand over in September are two different schedules with two different sets of inspections, and the plumbing has to be planned against the handover schedule rather than against the floor plan. Tell us the handover dates early and we will work back from them.
What about the specification?
We will tell you where a specification is going to cause you trouble, which is not the same as telling you what to buy. A fitting that looks identical on a schedule can be the one nobody stocks in Florida, and a water heater sized for the show unit is not sized for the three-bedroom. Those are cheap conversations at design stage and expensive ones at snagging.
Do you handle the snagging list?
Yes, and we would rather be the people who produce it than the people who receive it. Walking a unit before the buyer does, finding the things that will be on the list, and fixing them while there is no one living there is faster and cheaper than any of the alternatives. It also means the buyer's first impression of the building is not a defect report.
Tell us about the job
Send the details and we come back to you with a written quote. No call center, no runaround.
Plumbing by a licensed Florida contractor · Lic. #CFC1433820
