Kitchen & bathroom remodel plumbing

Moving services to suit a new layout, set out so the tile and the cabinetry land where they are supposed to.

A remodel is where plumbing decisions get made by people looking at a drawing rather than at a building, and where the cost of a bad decision is discovered by whoever lays the tile.

Supply moves easily. Waste does not.

This is the single most useful thing to know before a layout is agreed.

Supply pipework is small, pressurised and can be routed almost anywhere. Waste relies on gravity. It needs consistent fall, it needs venting, and the further it travels the more depth it eats.

That is why a bathroom layout that looks fine on a plan sometimes cannot be built without dropping a ceiling below, and why moving a toilet three feet is a different order of job from moving a basin three feet.

In a condo it is tighter again: the stack and riser belong to the building, and what can be re-routed within a unit is limited by what the building allows and by what is physically in the slab.

Ask before it is drawn. A ten-minute conversation at layout stage saves more money than anything else on a remodel.

The stages

Layout and survey. What is actually there, what can move, and what the building will allow. In older Miami Beach and Coral Gables properties this is also where we find out what the existing waste is — because a remodel over failing cast iron is a remodel you will be doing twice.

Strip-out. Removing fixtures and existing pipework, capping safely, and leaving the space ready for the trades that follow.

Rough-in. Supply, waste and vent set out to the finished dimensions — not the framing dimensions. This is the part that decides whether the trim lands where it should.

Test and inspection. Pressure tested and presented for inspection where inspection applies, before anything is closed.

Trim-out. Fixtures, valves, trim and appliance connections set, connected and tested.

Setting out against the finish

Rough-in has to allow for what goes on top of it: the tile, the backer board, the cabinetry, the countertop.

Getting that wrong is the classic remodel failure — a waste that lands an inch off, a valve set at the framing depth rather than the finished depth, a supply that emerges behind where the cabinet back will be. None of it shows until the finishes go on, and by then it is expensive.

So we agree finished dimensions with whoever is making them, rather than working from the drawing alone. Where the tile setter has not been appointed yet, we set out to the allowance and tell you what it assumes.

Working alongside other trades

Most remodels have several trades in a small space. We sequence with the framers, electricians and HVAC crew, and tell you early if something threatens the program rather than on the day it slips.

Where the property is occupied, we agree which fixtures stay in service and when water goes off, so a family is not discovering at 8am that there is no bathroom.

All work is completed to the Florida Building Code and presented for inspection where inspection applies, by a licensed Florida contractor, Lic. #CFC1433820.

The thing worth checking first

If the property was built before the mid-1970s and the drains are original, establish their condition before the remodel, not during it. Opening a floor twice costs far more than looking once. See cast-iron drain replacement.

The order things have to happen in

Remodels go wrong on sequence more often than on workmanship. The plumbing has three separate appearances on site, and each one has to land between the right pair of other trades.

Strip-out comes after the space is cleared and before the framers make any changes. Anything found here — failing waste, a stack that is not where the drawing says — is cheapest to deal with now.

Rough-in comes after framing and before drywall and tile backer. This is the immovable one. Once board goes on, moving a waste is a demolition job rather than a plumbing job.

Trim-out comes after tile, after the cabinetry is set, and after the countertop is templated and fitted. Setting fixtures before the finishes are in is how they get damaged and how they end up at the wrong height.

If a program compresses, it is usually rough-in that gets squeezed, and rough-in is the stage with the least tolerance for being rushed. We will say so rather than agreeing to it quietly.

What affects the cost

  • Whether waste moves. The biggest single factor.
  • How far, and through what. Slab, wall or ceiling void are three different jobs.
  • Fixture count and the number of wet walls.
  • Condo constraints. Association approval, insurance certificates, booked elevators, restricted hours and scheduled shut-offs all take time.
  • What is found on strip-out. We stop and re-quote rather than adding it to the invoice.
  • Whether the existing pipework is sound. Remodelling over failing pipe is not a saving.

What these usually cost

Real bands, the same ones the estimator uses. Miami market rates less 10%.

Remodel plumbing
Needs a visit

Based on what you told us and what jobs like this usually cost in Miami. The price you pay comes from a written quote after we have seen the job — and we do not start work without one.

The call-out is free if you go ahead with the work.

Get your own number in four taps

See what every job costs

Get a quote for this

Tell us what you need done. The more detail you give, the closer the quote will be.

Covered across Miami-Dade and the surrounding South Florida area.

Who this is for

Questions we get asked about this

Can any fixture be moved anywhere?

Supply can go almost anywhere. Waste cannot — it needs fall and it needs venting, and those two constraints decide most bathroom layouts. We will tell you what your property will take before a designer draws something it will not.

When in the project should we involve you?

At the layout stage, before anything is ordered. A ten-minute conversation about where the waste can run saves more money than any other part of this job.

Do you work with our contractor and tile setter?

Yes, and it is much better that way. Rough-in has to be set out so trim-out lands where the tile and cabinetry expect it, which means agreeing finished dimensions with the people making them.

We are in a condo. Does that change things?

Considerably. The stack and riser belong to the building, waste often cannot be re-routed freely, and the association will have rules about shut-offs, hours and insurance. Tell us the building early — it shapes what is possible.

How a job runs

  1. You tell us the job Through the form or WhatsApp, with a photo if you have one. A photo of the leak and the pipework around it usually tells us what to bring.
  2. We quote in writing Before anything starts. What is included, what is not, and what would change the price. No doorstep numbers.
  3. We turn up and do it At the time we said. Floors protected, work done to Florida Building Code, and we tell you straight away if we find something behind the wall.
  4. We clean up and check it Tested, tidied, and the old parts taken away or left with you.

Tell us about the job

Send the details and we come back to you with a written quote. No call center, no runaround.