Plumbing is one of the eight. What that means for your reserve study
Florida names plumbing as a component your reserve study has to cover. Most boards have never had to put a number against the condition of their pipes.
· Updated October 18, 2026
Most boards have never had to put a number against the condition of their plumbing. For
most of the life of most buildings, plumbing was something you dealt with when it failed,
and the reserve conversation was about the roof and the paint.
Florida changed that after Surfside. A condominium of three stories or more has to have a
structural integrity reserve study, and the study has to cover a defined list of
components. Plumbing is on that list by name — not folded into a general maintenance
category, but sitting alongside the roof, the load-bearing structure, the fireproofing,
the electrical, the waterproofing, the windows and exterior doors.
Two things follow from that, and the second is the one boards underestimate.
The number has to exist, and then it has to be funded
A reserve study estimates remaining useful life and replacement cost, and sets out what
the association should be putting aside. That part is familiar.
What is less familiar is that the ability to vote those reserves down was removed for
this particular list of components. A board can no longer resolve to underfund the
plumbing line because this year is difficult. The line has to be there and it has to be
funded.
That turns a vague worry into a budget item with a figure attached, and the figure is
going to be in the association’s documents for a long time. Which is why it is worth the
figure being attached to something.
A number pulled out of the air is worse than no number
Here is the practical problem. A reserve specialist is not a plumber. They are good at
what they do — useful life tables, cost escalation, funding models — and the input they
need for the plumbing line is a condition assessment they are not equipped to make
themselves.
So the number often comes from the age of the building and a standard table. That is a
defensible starting point and a poor finishing one, because the variance between two
buildings of the same age is enormous.
Take two Miami Beach towers, both topped out in 1972. One was built with cast-iron waste
and has sat in salt air with hard water running through it for fifty years, never
touched. The other had its stacks relined after a leak in the nineties, and the risers
replaced in a renovation nobody remembers. The table gives both of them the same answer.
The buildings are not remotely in the same position, and only one of those boards is
about to get a surprise.
The surprise runs both ways, which is the part worth saying plainly. A building that is
quietly in better shape than the table assumes is being asked to over-fund — real money
taken from real owners for a replacement that is further away than anybody thinks. That
is not a happy ending either. It is just a quieter one.
What evidence actually looks like
You do not need every stack opened up. You need enough looked at, properly, that the
picture is honest and the gaps are named.
What is actually installed. Cast iron, galvanized, copper, CPVC, PVC — and where each
of them is, because buildings are rarely one thing. A 1960s tower with a 1990s renovation
on three floors is four materials in one riser diagram.
What the inside looks like. For waste stacks this means camera work, because a
cast-iron pipe that looks sound from the outside can be most of the way gone on the
inside, and the outside is the only part anybody normally sees.
What the water has done. Scale, corrosion, pinholing — hard water in Miami-Dade works
on everything continuously, and its effects are visible if you know where to look.
What has already been replaced. The single most useful thing in a lot of buildings,
and the one most often lost. Work done in 1998 by a contractor nobody has the paperwork
for still happened, and it still changes the number.
Where the evidence is thin. A survey that admits it could not get into two risers is
worth more than one that implies full coverage it did not have. Your specialist can work
with a known gap. They cannot work with one they do not know about.
What we do, and what we don’t
We survey and we document. We can tell you what is in the walls, what condition it is in,
where it is worst, and what we could not see. We will write it so that an owner can read
it and a reserve specialist can cost it, and we will tell you plainly where we are
inferring rather than observing.
We do not write the reserve study. We are not your reserve specialist, we are not your
engineer, and we are not your attorney. The statute, your declaration and your deadlines
belong to people whose job that is — and the rules here have been amended more than once
since 2022, so they are worth checking rather than remembering.
What we can tell you about with authority is the pipe. That has been the trade for
nineteen years, most of it in London buildings old enough to make a 1972 tower look new.
If your deadline is close
The honest advice is to get the condition work started separately from the study rather
than waiting for the specialist to ask. Surveys take scheduling — access to risers, a
camera, cooperation from residents who have to let somebody into a bathroom — and that is
the part that does not compress when a deadline gets close.
A board that already holds a written condition record is in a different conversation from
one that is trying to arrange access in December.